Daikin’s new Hornby facility marks a major upgrade for their South Island operations — a purpose-built distribution centre designed to support higher capacity, improved workflow, and a strong commitment to sustainability. With Green Star Credits a key priority, Daikin required an electrical and solar partner capable of delivering efficiency, precision, and performance at scale.

ATL was engaged to complete the full internal and external electrical installation, alongside a large solar system designed to support Daikin’s long-term energy goals. The result is a modern, efficient, high-performing site built for the future.

Objectives

Daikin required a complete electrical and energy solution covering both the warehouse and office spaces. Key requirements included.

  • Full internal electrical fit-out across offices, showroom, trade centre, training room, kitchen and boardroom

  • Complete warehouse power and lighting design

  • Carpark, perimeter and canopy lighting

  • Emergency lighting throughout entire site

  • Wiring for automated dock levellers

  • EV charging stations

  • Large solar system to support Green Star sustainability targets (98.6 kW expected performance)

  • Extensive metering for energy consumption and monitoring

  • Feature lighting and high-quality lighting control in key customer-facing areas

 

Sustainability, efficiency, safety, and future-proofing were primary priorities across all decision-making.

Challenges

This project came with several large-scale construction challenges:
 

Green Star electrical compliance

The Green Star certification process required extensive electrical testing, documentation, and coordination with on-site assessors — more involved than a standard commercial install.

 

Warehouse lighting complexity

As racking layouts evolved, ATL revisited and adjusted high-bay lighting positions and heights to ensure safe, even illumination across all storage zones.

 

Coordination across a major build

With multiple subcontractors and overlapping construction stages, precision coordination was critical to maintaining momentum and meeting timelines.

 

Large solar installation

A total of 170 panels were installed — a straightforward design but a significant logistical scope due to size and roof coverage.

Solutions Delivered

ATL approached the project through tight collaboration between internal divisions, external partners, and on-site teams. Regular planning meetings ensured accurate staging, safe operation and full alignment with Daikin’s timeline.

Key solutions included:

 

Full internal & external electrical works

  • Office and showroom fit-out

  • Warehouse lighting and power distribution

  • Carpark and perimeter lighting

  • Gate electrical connections

  • Kitchen LED strip lighting

  • Training room electrical setup

  • Emergency lighting installation and certification

 

Feature & mood lighting

  • Boardroom mood lighting system

  • External colour-changing Coreplex feature lighting visible from long distances

  • Kitchen and office strip lighting to complement architectural finishes

 

Warehouse functionality

  • Wiring for dock levellers and elevated loading floor

  • Lighting repositioning in response to racking heights

  • Optimised power distribution for warehouse workflow

 

Solar system installation

  • Approx. 170 panels

  • Designed to produce approx. 98.6 kW

  • Expected annual energy production of 110 mWh

  • Real-time solar + consumption display in the trade centre

  • Built to meet Green Star requirements

 

Future-proofing

  • Infrastructure for two additional EV chargers

  • Extensive metering for long-term energy monitoring

Results

The project was completed on time and within budget, delivering a modern distribution centre that meets Daikin’s operational, safety, and sustainability goals.

Key outcomes

  • Efficient, compliant warehouse lighting supporting full racking heights

  • Seamless truck access via fully wired dock levellers

  • Significant solar generation expected to offset 110 mWh of energy annually

  • Green Star-aligned metering and monitoring

  • A modern, tech-forward office and showroom environment

  • High-impact feature lighting throughout customer zones

 

The large-scale solar installation and multi-division coordination demonstrate ATL’s capability in delivering complex commercial projects from start to finish.

 

Project Highlights

  • 170-panel solar array supporting sustainability targets

  • Colour-changing Coreplex feature lighting

  • Extensive office, boardroom and showroom lighting design

  • Elevated loading docks with integrated controls

  • Large-scale warehouse power + lighting installation

  • Green Star-ready energy monitoring system

Conclusion

The Daikin Hornby development showcases ATL’s ability to deliver high-performance electrical and solar installations for major commercial builds. Through smart coordination, multi-division expertise, and a commitment to efficiency and sustainability, ATL delivered a future-ready distribution centre built to support Daikin’s long-term growth.