Full Electrical, Lighting & Solar Installation.
Daikin’s new Hornby facility marks a major upgrade for their South Island operations — a purpose-built distribution centre designed to support higher capacity, improved workflow, and a strong commitment to sustainability. With Green Star Credits a key priority, Daikin required an electrical and solar partner capable of delivering efficiency, precision, and performance at scale.
ATL was engaged to complete the full internal and external electrical installation, alongside a large solar system designed to support Daikin’s long-term energy goals. The result is a modern, efficient, high-performing site built for the future.
Daikin required a complete electrical and energy solution covering both the warehouse and office spaces. Key requirements included.
Full internal electrical fit-out across offices, showroom, trade centre, training room, kitchen and boardroom
Complete warehouse power and lighting design
Carpark, perimeter and canopy lighting
Emergency lighting throughout entire site
Wiring for automated dock levellers
EV charging stations
Large solar system to support Green Star sustainability targets (98.6 kW expected performance)
Extensive metering for energy consumption and monitoring
Feature lighting and high-quality lighting control in key customer-facing areas
Sustainability, efficiency, safety, and future-proofing were primary priorities across all decision-making.
This project came with several large-scale construction challenges:
Green Star electrical compliance
The Green Star certification process required extensive electrical testing, documentation, and coordination with on-site assessors — more involved than a standard commercial install.
Warehouse lighting complexity
As racking layouts evolved, ATL revisited and adjusted high-bay lighting positions and heights to ensure safe, even illumination across all storage zones.
Coordination across a major build
With multiple subcontractors and overlapping construction stages, precision coordination was critical to maintaining momentum and meeting timelines.
Large solar installation
A total of 170 panels were installed — a straightforward design but a significant logistical scope due to size and roof coverage.
ATL approached the project through tight collaboration between internal divisions, external partners, and on-site teams. Regular planning meetings ensured accurate staging, safe operation and full alignment with Daikin’s timeline.
Key solutions included:
Full internal & external electrical works
Office and showroom fit-out
Warehouse lighting and power distribution
Carpark and perimeter lighting
Gate electrical connections
Kitchen LED strip lighting
Training room electrical setup
Emergency lighting installation and certification
Feature & mood lighting
Boardroom mood lighting system
External colour-changing Coreplex feature lighting visible from long distances
Kitchen and office strip lighting to complement architectural finishes
Warehouse functionality
Wiring for dock levellers and elevated loading floor
Lighting repositioning in response to racking heights
Optimised power distribution for warehouse workflow
Solar system installation
Approx. 170 panels
Designed to produce approx. 98.6 kW
Expected annual energy production of 110 mWh
Real-time solar + consumption display in the trade centre
Built to meet Green Star requirements
Future-proofing
Infrastructure for two additional EV chargers
Extensive metering for long-term energy monitoring
The project was completed on time and within budget, delivering a modern distribution centre that meets Daikin’s operational, safety, and sustainability goals.
Key outcomes
Efficient, compliant warehouse lighting supporting full racking heights
Seamless truck access via fully wired dock levellers
Significant solar generation expected to offset 110 mWh of energy annually
Green Star-aligned metering and monitoring
A modern, tech-forward office and showroom environment
High-impact feature lighting throughout customer zones
The large-scale solar installation and multi-division coordination demonstrate ATL’s capability in delivering complex commercial projects from start to finish.
Project Highlights
170-panel solar array supporting sustainability targets
Colour-changing Coreplex feature lighting
Extensive office, boardroom and showroom lighting design
Elevated loading docks with integrated controls
Large-scale warehouse power + lighting installation
Green Star-ready energy monitoring system
The Daikin Hornby development showcases ATL’s ability to deliver high-performance electrical and solar installations for major commercial builds. Through smart coordination, multi-division expertise, and a commitment to efficiency and sustainability, ATL delivered a future-ready distribution centre built to support Daikin’s long-term growth.